Description
SKU: EL326F-18-SCN
Designed for extended reach excavation, dredging, slope finishing, and specialized earthmoving applications, this 18-meter long reach package is compatible with CAT 324EL, 326F, and 326FL excavators. Manufactured from high-strength steel and engineered for durability, this complete package i... More ▶
Designed for extended reach excavation, dredging, slope finishing, and specialized earthmoving applications, this 18-meter long reach package is compatible with CAT 324EL, 326F, and 326FL excavators. Manufactured from high-strength steel and engineered for durability, this complete package i... More ▶
SKU: EL326F-18-SCN
Designed for extended reach excavation, dredging, slope finishing, and specialized earthmoving applications, this 18-meter long reach package is compatible with CAT 324EL, 326F, and 326FL excavators. Manufactured from high-strength steel and engineered for durability, this complete package is ready for installation and demanding job site conditions.
Supporting structure included for easier packing and transportation
CE mark
• Using Computerized analysis for the stress distribution of the long reach and optimizes the design structure
• Using larging milling equipment to improve welding
• Using Cold-rolled precision steel for the pipes and finishing by phosphoric acid washing, in order to make the pipes smoother, reducing hydraulic oil flow resistance and reducing oil circuit pollution
• Using robotic top quality welding
• Using ultrasonic non-destructive testing to ensure the welding quality
• Using top Quality boring machine to ensure the parallelism of the pin holes
• All products are sandblasted, the appearance of the product is smooth and clean
• Using top quality cylinders ◀ Less
Designed for extended reach excavation, dredging, slope finishing, and specialized earthmoving applications, this 18-meter long reach package is compatible with CAT 324EL, 326F, and 326FL excavators. Manufactured from high-strength steel and engineered for durability, this complete package is ready for installation and demanding job site conditions.
Supporting structure included for easier packing and transportation
CE mark
• Using Computerized analysis for the stress distribution of the long reach and optimizes the design structure
• Using larging milling equipment to improve welding
• Using Cold-rolled precision steel for the pipes and finishing by phosphoric acid washing, in order to make the pipes smoother, reducing hydraulic oil flow resistance and reducing oil circuit pollution
• Using robotic top quality welding
• Using ultrasonic non-destructive testing to ensure the welding quality
• Using top Quality boring machine to ensure the parallelism of the pin holes
• All products are sandblasted, the appearance of the product is smooth and clean
• Using top quality cylinders ◀ Less
Contact Advertiser:
Jack YaoBedrock Machinery
8925 Research Dr
Irvine, CA 92618
USA